Hebei Chuanheng Auto Parts Co., Ltd.
Deposit Tank Series
Deposit Tank Series
PRODUCTS
Name:Piggy Bank
Technical Requirements:
1. The surface of the cylinder is not sprayed with plastic, and the bracket and steel belt are sprayed with plastic.
2. The working pressure of the storage tank is 0.88MP
3. The interface is sealed with a plastic plug
隐藏域元素占位
Name:Piggy Bank
Technical Requirements:
1. The surface of the cylinder is not sprayed with plastic, and the bracket and steel belt are sprayed with plastic.
2. The working pressure of the storage tank is 0.88MP
3. The interface is sealed with a plastic plug
隐藏域元素占位
Name:Piggy Bank
Technical Requirements:
1. The surface of the cylinder is not sprayed with plastic, and the bracket and steel belt are sprayed with plastic.
2. The working pressure of the storage tank is 0.88MP
3. The interface is sealed with a plastic plug
隐藏域元素占位
Name:Piggy Bank
Technical Requirements:
1. The surface of the cylinder is not sprayed with plastic, and the bracket and steel belt are sprayed with plastic.
2. The working pressure of the storage tank is 0.88MP
3. The interface is sealed with a plastic plug
隐藏域元素占位
Name:Piggy Bank
Technical Requirements:
1. The surface of the cylinder is not sprayed with plastic, and the bracket and steel belt are sprayed with plastic.
2. The working pressure of the storage tank is 0.88MP
3. The interface is sealed with a plastic plug
隐藏域元素占位
Name:Piggy Bank
Technical Requirements:
1. The surface of the cylinder is not sprayed with plastic, and the bracket and steel belt are sprayed with plastic.
2. The working pressure of the storage tank is 0.88MP
3. The interface is sealed with a plastic plug
隐藏域元素占位
Name:Water Tank
Technical Requirements:
1. The welding is firm and reliable, and there should be no defects such as welding slag & middot; porosity, and the welding slag should be cleaned after welding.
2. The water tank assembly must not have any welding leakage, according to the standard and the relevant seals, and maintain a pressure of 02MPa and argon for 10Min
3. Keep the cleanliness inside the water tank so that it cannot contain impurities such as welding slag larger than 0.4mm, and the total amount should not exceed 1000mg.
隐藏域元素占位
NEWS
undefined
Contact Us
Sales: +86-15200188018
Fax: +86-13383198807
E-mail: chuanheng@hbqhgcjx.cn
Address: Wangguanzhuang Industrial Development Zone, Qinghe County
Our Products
The company has more than 100 sets of mechanical processing equipment and other equipment. CNC pipe bender, CNC drilling machine, welding machine, etc., with 4 advanced straight wire pipe production lines and 1 spray line
Follow Us

Scan to add wechat

Website